Lockheed Martin (NYSE: LMT) announced today that the second Space-Based Infrared System (SBIRS) geosynchronous orbit (GEO-2) spacecraft is progressing through a series of key tests that will ...
NASA/MSFC plans to issue a sole source Request for Proposal (RFP) for the follow-on Phase II, the Implementation Phase (Design, Fabrication and Testing), of the Integrated System Test of an ...
As the sophistication of semiconductors continues to grow, so does the need for system-level test (SLT) in production to ensure that high-performance processors, chiplets, and other advanced devices ...
(CHARLOTTE, N.C. – July 18, 2012) –The Babcock & Wilcox Company (B&W) (NYSE:BWC) announced today that its B&W mPower™ reactor Integrated System Test (IST) facility has achieved full operating ...
IST verifies the interaction of multiple building systems under real-world conditions, including emergency scenarios like power outages. The commissioning provider (CxP) leads, observes, and documents ...